Set-Up And Operation; Unpacking And Inspection - AEG PROTECT C. 1000 (S) Operating Instructions Manual

Table of Contents

Advertisement

4

Set-Up and Operation

4.1

Unpacking and Inspection

The device has been fully tested and inspected. Although the
device has been packed and shipped with the usual degree of
care, damage during transport cannot be ruled out
completely.
i
Check the shipping container for damage on arrival. If
necessary, ask the transport company to check the goods
and make a record of the damage in the presence of the
member of staff from the transport company. Don't turn on the
unit and register the damage with the AEG representative or
dealer immediately.
Check the delivery is complete:
PROTECT C.(S) with 1000, 2000 or 3000 VA
Mains connection cable with shockproof plug
Three load connection cables (10 A)
Communication cable
CD with "CompuWatch" shutdown software
Operating instructions
Delivery of external battery modules includes:
External battery unit
Special battery connection cable
Please contact our hotline (see page 4) in case of any
discrepancy.
The original packaging provides effective protection against
mechanical shocks and should be retained so the unit can be
transported safely later on.
Claims for damage during transport must always
be made with the transport company!
Please keep the plastic packaging bags away
from babies and children in order to safeguard
against suffocation accidents.
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents