HP Cluster Platform Introduction v2010 Introduction Manual page 62

Hp cluster platform site preparation guide
Hide thumbs Also See for Cluster Platform Introduction v2010:
Table of Contents

Advertisement

safety considerations, 12
safety symbols, 10
schedule
delivery, 7
installation, 7
security, 20
service
minimum clearances for, 24
service options, 10
shipping, 21
shipping bolt, 40
shipping dock, 36
shock pallet, 16
side panel
installing, 44
site
inspection, 8
survey, 7
site access, 20
site inspection, 46, 47
site plan
preparing, 7
resources, 7
site preparation, 19
cable estimating, 29
cable length, 28
cable protection, 28
cable routing, 29
cable types, 28
configuration rules, 16
connections, 28
data and communications, 31
delivery route, 36
delivery status, 16
environmental, 32
estimating total weight of installation, 26
flooring, 26
grounding requirements, 32
installation overview, 16
labor requirements, 20
minimum clearances for servicing, 24
overview, 19
PDU, 30
physical characteristics, 21
planning for connections, 27
planning hardware delivery, 35
power, 25
power and cooling, 25
power and cooling worksheet, 25
power connections, 29
power outlets, 30
power supply, 31
preventing electrostatic damage, 57
rack layout, 27
racks, 16
raised flooring, 26
safety considerations, 12
supporting documentation, 19
TCP/IP address, 31
62
Index
tools and resources required, 35
trucking, 26
unpacking space requirements, 23
UPS, 30
weight, 26
weight worksheet, 26
space
air circulation, 24
space requirement, 23
spike protection, 30
standard
ASHRAE, 33
electrical, 32
NEC, 32
NFPA, 32, 51
static electricity, 13, 57
static-dissipating work mat, 57
static-sensitive devices, 57
straps
heel, 57
toe, 57
wrist, 57
support
terms of, 10
surge
current, 30
suppression, 30
survey
delivery, 8
site, 7
system board
safety, 57
T
TCP/IP addresses, 31
techservers URL, 8
thermal stabilization, 37
toe straps, 57
tools
conductive, 57
topology, 50
fat tree, 50
network, 31
trash removal, 21
trucking, 26
U
UBB, 16
uninterruptible power supply, 30
load limit, 32
rating, 30
unpacking, 23, 37, 38
UPS (see uninterruptible power supply)
using the guide, 7
UXR, 16
V
voltage levels, 29
Voltaire

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cluster platform

Table of Contents