HP Cluster Platform Introduction v2010 Introduction Manual page 60

Hp cluster platform site preparation guide
Hide thumbs Also See for Cluster Platform Introduction v2010:
Table of Contents

Advertisement

illumination, 35
important information, 11
InfiniBand
cables, 28
InfiniBand Trade Association
URL, 10
information, customer, 46
inspection, site, 8
installation
estimating total weight of, 26
human resources, 20
overview, 16
planning, 15
preventing electrostatic damage, 57
safety considerations, 12
site preparation, 19
installation guide, 7
installation overview, 16
installation requirements
data and comms, 31
environmental considerations, 32
grounding, 32
hardware delivery verification, 35
labor, 20
minimum clearance for servicing, 24
PDU, 30
power connections, 29
power outlets, 30
power supply, 31
time, 20
tools and resources, 35
UPS, 30
installation schedule, 7, 46
integration, 15
interconnect
cable types, 28
Myrinet, 7
interconnect topology, 50
L
LAN, 31
laser radiation, 12
legal notices and trademarks, 2
leveler
feet, 43
using, 43
lifting, 20
low-frequency ground, 53
M
maximum rack configurations, 19
metal particulate contamination, 55
motors, 34
Myricom
URL, 9
Myrinet
interconnect, 7
60
Index
N
NEC standard, 32
network
topology, 31
NFPA, 51
NFPA standards, 32
noise
calculating levels, 56
level, 33
noise levels, 13
O
online documentation, 9
P
packaging
recycling, 14
pallet, 16
checking, 39
preparing, 39
ramp, 41
ramps, 40
removing, 39
PDU
connectors, 30
specifications, 30
spike protection, 30
surge current, 30
surge suppression, 30
planning, 16
access space, 24
cable estimating, 29
cable length, 28
cable protection, 28
cable routing, 29
cable types, 28
checklist, 46
configuration rules, 16
connections, 28
connections and cabling, 27
cooling, 25
data and communications, 31
delivery route, 35, 36
delivery status, 15
delivery survey, 48
documentation, 19
environmental, 32
flooring, 26
Global Deployment Services, 15
heat load, 25
installation, 15
installation schedule, 46
PDU, 30
physical characteristics, 21
power, 25
power and cooling worksheet, 25
power connections, 29
power needs, 25
power outlets, 30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cluster platform

Table of Contents