1 Preparing for Installation 1.1 Audience This guide is intended for HP service representatives and other persons trained to install hardware options in HP 10000 series racks. Such persons are expected to understand the hazards of working in this environment and to take suitable precautions to minimize danger to themselves and others.
Figure 1-1 Cable Management Brackets The following list corresponds to the callouts shown in Figure 1-1. Cable management bracket – right side Cable management bracket – left side Right side cable management bracket top and side views (left side cable management bracket opposite).
Page 11
— A work surface adjacent to the rack. — A stable work platform or step stool that enables you to safely reach components installed in the upper part of the rack. 1.5 Required Resources...
2 Installing the Cable Management Brackets Use the following procedure to install the Cisco SFS 7012D InfiniBand Interconnect Cable Management Brackets. The location of the bracket depends on the rack position occupied by the Cisco SFS 7012D InfiniBand Interconnect. The Cisco SFS 7012D InfiniBand Interconnect used in an HP Cluster Platform solutions are installed in the lower “U”...
Bottom rackmount brackets Direction of view facing toward the rear of the rack Heyclip used to support the Cisco 7012D power cables (quantity two) 2.1 Cable Routing Options Figure 2-2 shows the cable routing options for the Cisco SFS 7012D Cable Management Brackets. Figure 2-2 Cable Routing Options The following list corresponds to the callouts shown in Figure...