Site Inspection Checklists; Site Inspection Worksheet - HP Cluster Platform Introduction v2010 Introduction Manual

Hp cluster platform site preparation guide
Hide thumbs Also See for Cluster Platform Introduction v2010:
Table of Contents

Advertisement

Table A-1 Customer and HP Information Worksheet (continued)
Secondary customer
contact:
Traffic coordinator:
HP Information
Order No:
Sales representative:
Site Surveyor:
Survey Date:
Delivery Date:
A.3.2 Site Inspection Checklists
Use the worksheet in
Table A-2 Site Inspection Worksheet
Item
Computer Room
Is a floor plan complete?
Is the service space adequate?
Is access to the site or computer room restricted?
Is the computer room structurally complete? If not,
what is the expected date of completion?
Is a raised floor installed and in good condition?
What is the floor to ceiling height? [7.5 ft (228 cm)
minimum]
Is the raised floor adequate for equipment loading?
Are floor tiles in good condition and properly
braced?
Is the cable routing planning complete?
Is the connection to the customer's LAN/WAN
planned?
Is a metallic particulate test required?
Power and Lighting
Are lighting levels adequate for maintenance?
Are there AC power outlets available for servicing
needs?
Does the input voltage correspond to equipment
specifications?
Does the input frequency correspond to equipment
specifications?
Are lightning arrestors installed inside the building?
Is power conditioning equipment installed?
Is there a dedicated branch circuit for equipment?
Table A-2
to perform a site inspection.
Telephone:
Telephone:
Telephone:
Telephone:
Check
Comment or Date
Y
N
E-mail:
E-mail:
E-mail:
E-mail:
A.3 Site Inspection
47

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cluster Platform Introduction v2010 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Cluster platform

Table of Contents