Unpacking And Inspecting The System; Public Telecommunications Network Connection; Verifying Site Preparation; Checking The Inventory - HP 9000 Superdome SX2000 Installation Manual

Hp installation guide, hp integrity superdome/sx2000 and hp 9000 superdome/sx2000 servers
Hide thumbs Also See for 9000 Superdome SX2000:
Table of Contents

Advertisement

Public Telecommunications Network Connection

Instructions are issued to the installation site that modems cannot be connected to public
telecommunications networks until full datacomm licenses are received for the country of installation.
Some countries do not require datacomm licenses. The product regulations engineer must review
beta site locations, and if datacomm licenses are not complete, ensure that the installation site is
notified officially and in writing that the product cannot be connected to public telecommunications
networks until the license is received.

Unpacking and Inspecting the System

This section describes what to do before unpacking the server and how to unpack the system itself.
WARNING!
of more than 15 degrees.

Verifying Site Preparation

Verifying site preparation includes gathering LAN information and verifying electrical requirements.
Gathering LAN Information
The Support Management Station (SMS) connects to the customer's LAN. Determine the appropriate
IP address.
Verifying Electrical Requirements
The site must be verified for proper grounding and electrical requirements prior to the system being
shipped to the customer as part of the site preparation. Before unpacking and installing the system,
verify with the customer that grounding specifications and power requirements are met.

Checking the Inventory

The sales order packing slip lists all equipment shipped from HP. Use this packing slip to verify
that all equipment has arrived at the customer site.
NOTE:
To identify each item by part number, see the sales order packing slip.
One of the large overpack containers is labeled "Open Me First." This box contains the Solution
Information Manual and DDCAs. The unpacking instructions are in the plastic bag taped to the
cabinet.
The following items are in other containers. Check them against the packing list:
Power distribution control assembly (PDCA) and power cord
Two blower housings per cabinet
Four blowers per cabinet
Four side skins with related attachment hardware
Cabinet blower bezels and front door assemblies
Support Management Station
Cables
Optional equipment
Boot device with the operating system installed
Do not attempt to move the cabinet, packed or unpacked, up or down an incline
Unpacking and Inspecting the System
7