Gateway ALR 7300 Maintaining And Troubleshooting page 50

Gateway server user manual
Hide thumbs Also See for ALR 7300:
Table of Contents

Advertisement

40
Maintaining and Troubleshooting the Gateway ALR 7300 Server
Place the drive bracket in the chassis (see Figure 23). If you are
9.
installing a second front-accessible drive, do not reinstall the 3.5-inch
metal filler panel when you reinstall the drive bay in the chassis.
Figure 23: Replacing the Drive Bracket
Secure the drive bracket to the chassis with the screws you removed in
10.
Step 5.
Connect the power and data cables to the 3.5-inch drive, making sure
11.
the cables match their original position. (See drive documentation for
proper drive jumper settings and cable orientation.)
Close the case, as described in "Closing the system" on page 8.
12.
Reconnect the power cord and turn on the system.
13.

Advertisement

Table of Contents
loading

Table of Contents

Save PDF