Keys To A Successful Installation
If not installed correctly by qualified personnel, the brewer will not operate properly and damage or injury may
result. Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
Electrical:
All FETCO brewers require NEUTRAL. Ground is not an acceptable substitute. Installation without neutral
may cause damage to the electronic components.
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location. Check with your local inspectors to determine what codes will apply.
Plumbing:
This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine.
Verify that the water line will provide at least ½ gallon per minute before connecting it to the brewer.
General:
Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory
may be found on our web site, http://www.fetco.com.
Installation Instructions
Brewer Setup
1. Review the Dimensions for the unit you are installing. Verify that the brewer will fit in the space intended for it,
and that the counter or table will support the total weight of the brewer and dispensers when filled.
2. Place the brewer on the counter or stand.
3. When the brewer is in position, use a bubble level to level
the brewer front to back as well as side to side by
adjusting the legs.
Water Connection
1. Water inlet is a ¼ inch female pipe fitting.
2. Install a water shut off valve near the brewer to facilitate service. If an in-line water filter is used, it should be
installed after the water shut off valve and in a position to facilitate filter replacement.
3. Flush the water supply line and filter before connecting it to the brewer.
4. Verify that the water line will provide at least ½ gallon per minute, and that the water pressure is between 20
and 75 psig.
Electrical Connection
1. Verify that the actual voltage at the electrical outlet is compatible with the
specifications on the brewer's serial number label.
2. The temperature and water tank fill level are pre-set at the factory.
There is no need to turn off the heaters during the installation process.
The control board disables the heaters until the tank is full of water. The
heating process will start automatically when the tank has filled.

Installation

(For Qualified Service Technicians Only)
4
Warning: Legs are to be adjusted for
leveling the brewer only. Do not use
for height adjustment or extend them
higher than necessary.
Warning: To prevent
electrical shock, this
unit must be properly
grounded.