4-2. Installing the motor
4-3. Installing the flange nut
(2)
(1)
(3)
(4)
(5)
2050Q
(1)
2051Q
HE-8000
Install the motor (1) with the three bolts (2), flat
washers (3), spring washers (4) and nuts (5).
Install the four flange nuts (1) to the underside of the
work table.
NOTE:
When the machine head is positioned horizontally,
some flange nut installation locations may be
inaccessible after the control box has been in-
stalled. Be sure to install the flange nuts correctly
so that they are not at an angle.
4. INSTALLATION
9