INSTALLATION AND OPERATION

3.1

TRANSPORTATION AND INSTALLATION

Transportation
Transport unit with forklift.
If carry by overhead crane, use four M12
eyebolts. (Not provided)
PROHIBIT
!
NOTE
3.2

INSTALLATION PROCEDURE

A) Note the load tolerance of the floor
Refer to Table 3.2 for list of UPS weights.
UPS Capacity (kVA)
Weight (lbs)
B) Minimum clearance required for ventilation
Right side
Left side
Back side
Top side (80-225kVA)
Top side (300-750kVA)
C) Space requirement for routine maintenance
Allow for the following space at the time of installation.
Front (80-225kVA)
Front (300-750kVA)
Sides
Back side
Top side
G9000 Installation and Operation Manual

TABLE 3.1 How to transport and install the system

Using the pre-drilled four holes in the UPS
channel base, anchor the unit using
appropriate hardware. (Not provided)
Do not transport UPS cabinet laid horizontally.
Cabinets must be maintained upright within ± 15° of the vertical
during handling
.
TABLE 3.2 List of UPS weights
80
100
160
855
855
1160
1 in. (25 mm) (not required when sidecars are used)
1 in. (25 mm) (not required when sidecars are used)
0.0 inch (0 mm)
20 inches (500 mm) (for air flow)
23.6 inches (600 mm) (for air flow)
40 inches (1000 mm)
42.3 inches (1075 mm)
0.0 inch (0 mm)
0.0 inch (0 mm)
20 inches (50 mm)
Installation
225
300
500
1230
2260
3360
750
4250
45