Figure 3.6 Power Wire Connections (Parallel System Configuration) - Toshiba G9000 SERIES Installation And Operation Manual

480/480 v 80/100/160/225/300/500/750 kva
Hide thumbs Also See for G9000 SERIES:
Table of Contents

Advertisement

62
FIGURE 3.6
Diagram of Power Wire Connections (Parallel System Configuration)
UPS-1
Bypass
Bypass input
Converter
/Charger
CB1
AC input
UPS-2
Bypass input
Bypass
Converter
/Charger
CB1
AC input
UPS-n
Bypass input
Bypass
Converter
/Charger
CB1
AC input
52S
Inverter
AC output
52C
CB2
Battery
52S
Inverter
AC output
52C
CB2
Battery
52S
Inverter
AC output
52C
CB2
Battery
Toshiba Tie Cabinet (TTC)
52MB
Maintenance
Bypass Breaker
52L1
UPS
Breaker
Output
Breaker
52CS
52L2
UPS
Breaker
UPS
Breaker
52Ln (*1)
(*1) n: Maximum=4 (80-225kVA)
Maximum=8 (300-750kVA)
G9000 Installation and Operation Manual