Installation And Operation; Transportation And Installation; Installation Procedure; Table 3.1 How To Transport And Install The System - Toshiba G8000MM Series Installation And Operation Manual

Hide thumbs Also See for G8000MM Series:
Table of Contents

Advertisement

3 INSTALLATION AND OPERATION

3.1

Transportation and Installation

TABLE 3.1 How to transport and install the system

Transportation
Transport unit with forklift.
Carry with overhead crane using
eyebolts provided.
Do not transport in a horizontal position. Cabinets must be maintained
upright within +/- 15° of the vertical during handling
CAUTION
3.2

Installation Procedure

A) Note the load tolerance of the floor
Refer to Table 3.2 for list of UPS weights.
TABLE 3.2 List of UPS weights
UPS Capacity (kVA)
Weight (lb.)
B) Minimum clearance required for ventilation
Right side
Left side
Back side
Top side
C) Space requirement for routine maintenance
Allow for the following space at the time of installation.
Front
Sides
Rear
G8000MM
Installation and Operation Manual
Using the pre-drilled holes (4 - 24) in the
UPS channel base, anchor the unit using
appropriate hardware. (Not provided)
100
150
225
2,061
2,579
3,263
1 in. (25 mm) (not required when sidecars are used)
1 in. (25 mm) (not required when sidecars are used)
0.0 in. (0.0 mm)
24 in. (600 mm) (for air flow)
40 in. (1000 mm) for 100kVA, 150kVA, 225kVA
43 in. (1075 mm) 300kVA, 375kVA, 500kVA, 625kVA, 750kVA
0.0 in. (0.0 mm)
0.0 in. (0.0 mm)
Installation
.
300
375
500
4,564
4,916
6,923
625
750
9,193
9,193
33

Advertisement

Table of Contents
loading

Table of Contents