Furuno FR-2125V Installation Manual page 15

Furuno marine radar user manual
Hide thumbs Also See for FR-2125V:
Table of Contents

Advertisement

(2) Unfasten five M3X8 screws at the top of the PTU board cover and two
M4X8 screws at the front of the PTU cover. Slide the PTU board cover
forward.
*Screw
(M3X8, 5 pcs.)
Slide forward
Figure 1-12 How to dismount the PTU cover
(3) Remove the cover by grasping the knob on the top of the cover.
10.Use M10 bolts, nuts and flat washers to fix the display unit at the rear mounting
holes, using the pipe box spanner (supplied).
11. Close the PTU board cover.
12.Push the monitor forward until you hear a click.
13.Refasten the bolts removed at step 3.
14. Fasten the left and right arm covers with M4X10 screws.
Console type mounting
1. Make six holes of 15 mm diameter and a cable entrance hole through the deck
referring to the outline drawing at end of this manual.
2. Open the front cover.
3. Fix the equipment by using M12 bolts, nuts and washers.
4. Hoist the console to the deck by using the eye bolts attached to the console.
Remove the eye bolts and set the cosmetic caps (w/washers) to the eye bolt
holes.
Fixing hole (rear)
J106
Knob
J105
J104
J103
*
Screw (M4X8, 2 pcs.)
Fixing hole (front)
J446
J466
J462
J465
1-8
*
*
*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents