Application Steps; Overview; Step 1. Plan The System; Step 2. Determine Other Bus Devices Required - Honeywell Excel 10 W7752D User Manual

Fan coil unit controllers lns plug-ins
Table of Contents

Advertisement

APPLICATION STEPS

Overview

Steps one through seven (see Table 8) address con-
siderations for engineering an Excel 10 FCU System. These
steps are guidelines intended to aid understanding of the pro-
duct I/O options, bus arrangement choices, configuration
options and the Excel 10 FCU Controllers' role in the overall
®
EXCEL 5000
System architecture.
Table 8. Application steps
Step No.
1
Plan the System
2
Determine Other Bus Devices Required
3
Lay Out Communication and Power Wiring
4
Prepare Wiring Diagrams
5
Order Equipment
6
Configure Controllers
7
Troubleshooting

Step 1. Plan the System

Plan the use of the FCU Controllers according to the job
requirements. Determine the location, functionality and sensor
or actuator usage. Verify the sales estimate of the number of
FCU Controllers and wall modules required for each model
type. Also check the number and type of output actuators and
other accessories required.
When planning the system layout, consider potential ex-
pansion possibilities to allow for future growth. Planning is
very important to be prepared for adding HVAC systems and
controllers in future projects.
notebook PC
using an LNS tool
Fig. 12. Connecting the portable operator terminal to the
L
W
ON
The L
W
communication loop between controllers must
ON
ORKS
be laid out according to the guidelines applicable for that
topology. FCU Controllers use FTT technology which allows
daisy chain, star, loop or combinations of these bus
configurations. See section "Step 3. Lay Out Communications
and Power Wiring" (page 18) for more information on bus
wiring layout, and see Fig. 13, Fig. 14, and Fig. 15 in section
"Step 4. Prepare Wiring Diagrams" (page 19) for wiring
details.
It is important to understand the interrelationships between
FCU Controllers on the L
ON
Description
shielded
interface
cable
Excel 10
FCU
controller
RS-232
serial
port
SLTA
network
ORKS
W
network early in the job
ORKS
EXCEL 10 FCU CONTROLLER LNS PLUG-INS USER GUIDE
engineering process to ensure their implementation when
configuring the controllers. (See section "Step 6. Configure
Controllers" [page 25] for information on the various Excel 10
FCU Controller parameters and on Excel 10 FCU Controller
point mapping.)
Step 2. Determine Other Bus Devices
Required
A max. of 62 nodes can communicate on a single L
segment. If more nodes are required, a router is necessary.
Using a router allows up to 125 nodes, divided between two
L
W
segments. The router accounts for two of these
ON
ORKS
nodes (one node on each side of the router). Table 9
summarizes the L
Table 9. LonWorks configuration rules and number of
One L
W
ON
ORKS
(Example)
Max. no. of Excel 10
Two L
W
ON
ORKS
(Example)
Max. no. of Excel 10
Controllers in segment
Max. no. of Excel 10
Controllers in segment
The max. length of an FTT L
(1400 m) for a daisy chain configuration or 1650 ft (500 m)
total wire length and (400 m) node-to-node for any other type
of configuration.
NOTE: In the case of FTT L
distance from each transceiver to all other trans-
ceivers and to the termination must not exceed the
max. node-to-node distance. If multiple paths exist,
the longest one should be used for the calculation.
LonWorks
port
If longer runs are required, add a router in order to partition
the system into two segments.
In addition, all L
a Bus Termination Module. For an FTT L
one or two Termination Modules may be required depending
upon the bus configuration. See section "Step 3. Lay Out
Communications and Power Wiring" (page 18) and the
L
W
Termination Module subsection in section "Step 4.
ON
ORKS
Prepare Wiring Diagrams" (page 19) for more details.
17
W
segment configuration rules.
ON
ORKS
device nodes
Segment
Max. No. of Nodes = 62
60 nodes (T7460/T7560 wall
Controllers
modules are not L
nodes)
Total 62 nodes
Segments
Max. No. of Nodes = 125
60 nodes (T7460/T7560 wall
modules are not L
number one
nodes)
60 nodes (T7460/T7560 wall
modules are not L
number two
nodes)
Total 125 nodes
W
segment is 4600 ft
ON
ORKS
W
segments, the
ON
ORKS
W
segments require the installation of
ON
ORKS
ON
EN2B-0285GE51 R0909
W
ON
ORKS
W
ON
ORKS
W
ON
ORKS
W
ON
ORKS
W
segment,
ORKS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents