Mount The Switch - Qlogic SANbox 5600 Series Installation Manual

Fibre channel switch
Hide thumbs Also See for SANbox 5600 Series:
Table of Contents

Advertisement

A
Installing a SANbox 5600 Series switch involves the following steps:
1.

Mount the switch.

2.
Install transceivers.
3.
Connect the management workstation to the switch.
4.
Configure the management workstation.
5.
Install the management application.
6.
Start the management application.
7.
Connect the switch to the AC power source.
8.
Configure the switch.
9.
Cable devices to the switch.
4.2.1
Mount the Switch
The switch can be placed on a flat surface and stacked or mounted in a 19" EIA
rack. Refer to
specifications. Adhesive rubber feet are provided for surface mounts. Without the
rubber feet, the switch occupies 1U of space in an EIA rack.
A model 5600 switch can be rack mounted without rails, however, rail kits
are available from General Devices™ Company, model number C-874:
A model 5602 switch requires a QLogic rail kit (part number
SB5602-RACKKIT) for rack mounting.
WARNING!!
AVERTISSEMENT!!
WARNUNG!! Switches so in das Rack einbauen, dass das Gewicht gleichmäßig
59096-02 C
"Dimensions" on page A-4
General Devices Company, LTD.
P.O. Box 39100
Indianapolis, IN 46239-0100
317-897-7000
www.generaldevices.com
Mount switches in the rack so that the weight is distributed evenly.
An unevenly loaded rack can become unstable possibly resulting in
equipment damage or personal injury.
Installer les commutateurs dans l'armoire informatique de sorte
que le poids soit réparti uniformément. Une armoire informatique
déséquilibré risque d'entraîner des blessures ou d'endommager
l'équipement.
verteilt ist. Ein Rack mit ungleichmäßiger Gewichtsverteilung kann
schwanken/umfallen und Gerätbeschädigung oder Verletzung
verursachen.
for weight and dimensional
4 – Installation
Installing a Switch
4-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents