Completing The Installation - Enterasys 2200 Installation & User Manual

Entersays networks user's guide smartswitch 2200
Hide thumbs Also See for 2200:
Table of Contents

Advertisement

3.5

COMPLETING THE INSTALLATION

After installing the 2H258-17R and any optional HSIM or VHSIM, and making the connections to
the network, proceed as follows:
1. Secure the cables by running the cables along the strain-relief bracket and tying them to the
strain-relief bracket using cable ties.
2. The 2H258-17R is now ready to be configured through Local Management. Refer to the
SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User's Guide for
information on how to access and use Local Management.
Completing the Installation
Installation
3-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

2h258-17rSmartswitch 2200 2h258-17r

Table of Contents

Save PDF