Adding Processors With Instant Capacity On Demand; Using The Checklist; Factory-Integrated Installation Checklist - HP rp7420 Service Manual

Hp 9000 rp7420 server - user service guide, fifth edition
Hide thumbs Also See for rp7420:
Table of Contents

Advertisement

3.
Configuration Menu> ma
Once the Primary Path has been set, use the bo (boot) command, from the Main Menu, to
boot HP-UX.
4.
Main Menu: Enter command or Menu> bo pri
5.
The following prompt displays:
Do you wish to stop at the ISL prompt prior to booting (y/n)?
Enter n.
NOTE:
If the partition fails to boot or if the server was shipped without Instant Ignition, booting
from a DVD that contains the operating system and other necessary software might be required.

Adding Processors With Instant Capacity On Demand

The Instant Capacity On Demand (iCOD) program provides access to additional CPU resources
beyond the amount that was purchased for the server. This provides the ability to activate
additional CPU power for unexpected growth and unexpected spikes in workloads. Internally,
iCOD systems physically have more CPUs, called iCOD CPUs, than the number of CPUs actually
purchased. These iCOD CPUs reside in the purchased system, but they belong to HP and therefore
are HP assets. A nominal "Right-To-Access Fee" is paid to HP for each iCOD processor in the
system. At any time, any number of iCOD CPUs can be "activated." Activating an iCOD CPU
automatically and instantaneously transforms the iCOD CPU into an instantly ordered and
fulfilled CPU upgrade that requires payment. After the iCOD CPU is activated and paid for, it
is no longer an iCOD CPU, but is now an ordered and delivered CPU upgrade for the system.
The most current information on installing, configuring, and troubleshooting iCOD can be found
at http://docs.hp.com.
NOTE:
You need to be aware of the iCOD email requirements. For further details, see
docs.hp.com.

Using the Checklist

The following checklist is an installation aid and should be used only after you have installed
several systems using the detailed procedures described in the body of this manual. This checklist
is a compilation of the tasks described in this manual, and is organized as follows:
PROCEDURES The procedures outlined in this document in order
IN-PROCESS
COMPLETED The final check to ensure that a step has been completed and comments
Major tasks are in bold type, sub tasks are indented.
Table 4-2 Factory-Integrated Installation Checklist
PROCEDURE
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
64
Cabling and Powering the Server
The portion of the checklist that enables you to comment on the
current status of a procedure
IN-PROCESS
Initials
Comments
COMPLETED
Initials
Comments
http://

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9000 rp7420

Table of Contents