Replacing Modules - Avaya PARTNER Advanced Communications System Quick Reference Manual

Hide thumbs Also See for PARTNER Advanced Communications System:
Table of Contents

Advertisement

Quick Reference Guide
Perform the following steps to replace the cover:
12
Position the carrier cover over the modules so that the openings on the
a
top of the carrier cover align correctly with the tabs at the top of the
installed 5-slot carrier and modules.
Rotate the carrier cover into position so that it aligns correctly with the
b
thumb screw opening on the bottom of the carrier.
Tighten the thumb screw. To ensure proper alignment and safe
c
operation, tighten the thumb screw securely.

Replacing Modules

Replacing system modules is similar to how the modules were installed into the
control unit. The procedure varies slightly between the stand-alone/2-slot carrier
configuration and the 5-slot carrier configuration.
Replacing Modules in a Stand-Alone or 2-Slot Carrier
Configuration
CAUTION:
Before starting, verify that you have batteries installed in the processor
module by viewing the display of the telephone at extension 10.
To replace a module or modules in a stand-alone or 2-slot carrier configuration:
Remove the power cord from the wall outlet.
1
Check the slack in the wires. If there is not enough slack to remove the
2
module without pulling the line and extension cords free, label and
disconnect the wires before continuing.
For a stand-alone configuration:
3
Remove the screws at the top and bottom of the processor module, and
a
remove the module from the wall.
Mount the new module by following the steps in
b
Stand-Alone Processor Module and a 2-Slot Carrier" on page
to Step 9.
6 Maintaining Your System
"Wall-Mounting a
14; then go
Replacing Modules
77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Partner advanced communications system 7.0

Table of Contents