Installing The Switch Into An Eia Cabinet; Time Required; Items Required - IBM SAN40B-4 - System Storage Switch User & Service Manual

User guide
Hide thumbs Also See for SAN40B-4 - System Storage Switch:
Table of Contents

Advertisement

2. Apply the adhesive rubber feet. Applying the rubber feet onto the switch helps
3. Place the switch on a flat, sturdy surface.
4. Provide power to the switch as described in "Powering the switch on and off" on
Attention:
correctly set. For instructions on how to set the IP address, see "Configuring the
switch" on page 15.

Installing the switch into an EIA cabinet

Attention:
replacement procedures, you must first ensure that the rack into which the switch is
to be installed is also customer accessible. If it is not, then only trained personnel
can install and service these switches in such a rack.
Attention:
related to rack and cabinet installations.
You can install the rack mount kit in either of two ways:
v To allow the port side of the switch to slide out of the exhaust-air side of the
v To allow the non-port side of the switch to slide out the cool-air side of the

Time required

Approximately 30 minutes, excluding cabling and configuration

Items required

You need the following items to install the switch in a slide-rail rack:
v Straight slot screwdriver
v Rack space: 1 EIA units of rack space, 48.3 cm (19 in.) wide, and 60.96 cm (24
v One power cord that is provided with the switch
v One power outlet
v Rack mount kit
prevent the switch from sliding off the supporting surface.
a. Clean the indentations at each corner of the bottom of the switch to ensure
that they are free of dust or other debris that might lessen the adhesion of
the feet.
b. With the adhesive side against the chassis, place one rubber foot in each
indentation and press into place.
page 21.
Do not connect the switch to the network until the IP address is
Although the switch has been designed for customer installation and
Attention:
before attempting any installation or maintenance procedures.
Refer to "Rack safety" on page xiv for danger and caution notices
cabinet. In this installation, the port side of the switch is flush with the edge of the
cabinet.
cabinet. In this installation, the port side of the switch is set 7.62 cm (3 in.) back
from the edge of the cabinet, allowing a more gradual bend in the fiber optic
cables.
in.) deep
Read the "Safety and environmental notices" on page ix
Chapter 2. Installing and configuring the switch
9