2-2
C
2: I
HAPTER
NSTALLING THE
Installing the
Switch
Following Safety
Information
Choosing a Suitable
Site
S
WITCH
The following sections describe how to site and install your Switch.
Before installing or removing any components from the Switch or
carrying out any maintenance procedures, you must read the safety
information Appendix A of this guide.
The Switch is suited for use in an office environment where it can be
wall-mounted, mounted in a standard 19-inch equipment rack, or free
standing. Alternatively, the Switch can be rack-mounted in a wiring
closet or equipment room. A wall-mounting/rack-mounting kit,
containing two mounting brackets and six screws, is supplied with the
Switch.
When deciding where to position the Switch, ensure that:
You are able to meet the configuration rules detailed in
"Configuration Rules for Fast Ethernet" on page 1-14 and
"Configuration Rules with Full Duplex" on page 1-15.
The Switch is accessible and cables can be connected easily.
Cabling is away from:
Sources of electrical noise such as radios, transmitters and
broadband amplifiers
Power lines and fluorescent lighting fixtures
Water or moisture cannot enter the case of the Switch.
Air-flow is not restricted around the Switch or through the vents in
the side of the Switch. We recommend that you provide a minimum
of 25mm (1in.) clearance.
No more than four Switch units are placed on top of one another, if
the units are free standing.