Chapter 1
Table 1-1. Site Preparation Checklist (Continued)
Environment and Space Requirements
Must meet OSHA, local code, and HP specifications for safety and supportability (3 feet
minimum access in front and rear of electrical cabinets)
Side access of 24 inches improves cable routing and management
Optimal: 24 hour air conditioning (68 - 72 deg. F; 20 - 22 deg. C, 40 - 60% RH)
Minimum: Maintain temperature inside NetServer enclosure between 41 and 95 deg. F,
5 - 35 deg. C
Enough table or work space for console terminal and user guides
Bookshelf for documentation
Area to store equipment until time of installation
Ensure all equipment and/or shipping pallets can fit through doorways, hallways, and
into and out of elevators
Data & Voice Communications (Pre-Tested and Verified)
Voice phone located at system console terminal with cord long enough to reach all parts
of the rack installation
Phone line for remote support at each system
Ethernet, FDDI, Token Ring, or other network connection standard
System Parameters
Hostname
IP address
Subnet Mask
Gateway IP Address
Gateway Host Name
DTC Node Name
Hardware Configuration, Cables,
Availability of I/O paths and SCSI addresses for add-on devices
Availability of I/O backplane slots, memory slots, and
Valid, supportable configuration for added devices, interfaces, memory, and
Correct type and length of cables, as specified in order documents
4
Preparation for Cabling the HP NetServer LH 6000r