HP D7171A - NetServer - LPr Manual page 12

Rack cabling reference guide
Hide thumbs Also See for D7171A - NetServer - LPr:
Table of Contents

Advertisement

Chapter 1
If you receive pre-configured units, follow assembly instructions from the
supplying organization first, if you have them. Otherwise, continue with this set of
instructions.
4. Move Rack Enclosures and Other Units to Installation Location
WARNING
Whenever you lift equipment, limit the amount of weight each
person picks up. Lift with your legs, not with your back.
Use two or more people and the proper equipment to move the rack enclosure,
server, mass storage units, and other components. Stage cartons a few feet from
your assembly and final power-up location.
5. Unpack Rack Enclosures and Hardware, Use Anti-Tip Measures, and Remove
the Shipping Panels
WARNING
Use care in moving the rack down from the pallet. Three
people are required for this step.
1. Follow any pictorial instructions on the outside of the shipping container to
unbox the rack enclosure.
2. Adjust the leveler screws, when present, under each of the four corners of
each rack. Lower each leveler screw to be in firm contact with the floor.
CAUTION
The leveler screws prevent the rack from rolling away when
you install components. Be sure to lower these screws before
you put anything into the rack.
3. Find and extend the anti-tip foot under the rack (or bolt on the anti-tip
mechanism, if included) before you mount any rack equipment on slides.
WARNING
When equipment is mounted on slides, a tip-over hazard
exists. Always take the precautions listed below:
mounting equipment on slides.
equipment at a time.
rack optimized units as shown in accompanying instructions.
8
Preparation for Cabling the HP NetServer LH 6000r
Extend or bolt on the anti-tip foot for each rack before
Never extend more than one piece of slide-mounted
Reduce weight by removing power supplies.
Always use the rack mounting handles that are shipped on

Advertisement

Table of Contents
loading

Table of Contents