Performing A Sequenced Reboot - Brocade Communications Systems A7990A - StorageWorks SAN Director 4/16 Blade Switch Administrator's Manual

Brocade fabric manager administrator's guide (53-10000196-01-hp, november 2006)
Hide thumbs Also See for A7990A - StorageWorks SAN Director 4/16 Blade Switch:
Table of Contents

Advertisement

To assign switches to an existing reboot group
1.
Click Tasks > Reboot > Create Reboot Sequence.
The Create or Change Reboot Groups and Sequence window displays (see
page
2.
Select a fabric from the Select Fabric drop-down list.
The switches in that fabric display in the Unassigned Switches list.
3.
Select the reboot group that you want to populate.
4.
Select a switch that you want to add to the reboot group and click the left arrow.
Use Shift-click and Ctrl-click to select multiple switches; then click the left arrow.
5.
Click OK to save the changes and close the window, or click Apply to save the changes without
closing the window.

Performing a Sequenced Reboot

Use the following procedure to create a list of switches to be rebooted and the order in which they are to
be rebooted.
To set up and run a sequenced reboot
1.
Log in to the switches that you want to reboot. See
Simultaneously" on page 4-4
2.
Click Tasks > Reboot > Sequence Reboot.
The Sequence Reboot window displays, as shown in
Figure 14-14 Sequenced Reboot
Fabric Manager Administrator's Guide
Publication Number: 53-1000196-01-HP
14-20).
for additional information.
Rebooting Switches
Figure 14-11 on
"Logging In to Multiple Switches
Figure
14-14.
14
14-23

Advertisement

Table of Contents
loading

Table of Contents