Verifying The Startup Process - Cisco IP CONFERENCE STATION 7936 Administration Manual

Ip conference station
Hide thumbs Also See for IP CONFERENCE STATION 7936:
Table of Contents

Advertisement

Chapter 2
Installing the Cisco IP Conference Station 7936
Step 1
Step 2
Step 3
Step 4
Step 5

Verifying the Startup Process

OL-4746-01
Follow these steps to install an IP Conference Station:
Place the IP Conference Station on a flat surface, for example, a conference room
table or desktop.
Connect one end of the 6-foot CAT 5 cable to your data network port and connect
the other end to the network (LAN) port on the PIM.
Connect the free end of the 25-foot CAT 5 cable to the RJ-45 port on the bottom
of the IP Conference Station. (The cable is pre-plugged into the PIM.)
Connect the power supply unit to the AC adapter port on the PIM, and plug the
other end into a standard electrical power outlet in the wall.
If you are using the External Microphone Kit, connect each of the microphone
extensions to the microphone jacks installed on the underside of the Cisco IP
Conference Station 7936. See
connection.
If you do not correctly connect the cables, PIM, and the power supply, the
Note
IP Conference Station will not work.
Use of non-Cisco certified components may not work and may void the
IP Conference Station product warranty.
After the IP Conference Station has been connected to power for at least
15 seconds, it begins its startup process by cycling through the following steps.
Installing the Cisco IP Conference Station 7936
Figure 2-2 on page 2-18
Cisco IP Conference Station 7936 Administration Guide
for an illustration of this
2-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents