Connect Equipment To The Ports And Power On The System - Cisco SFS-7012 - SFS InfiniBand Server Switch 7012 Hardware User's Manual

Server switch
Hide thumbs Also See for SFS-7012 - SFS InfiniBand Server Switch 7012:
Table of Contents

Advertisement

Chapter
Figure 2-9
b.
Figure 2-10 SFS 7012 Chassis — Leaf Module Slot Numbering
To install a module or filler, hold it so that the ejector handles are on the bottom.
Step 2
Pull the handles out to extend them. Slide the module into the appropriate slot of the chassis until it
Step 3
makes contact with the backplane. As the module seats in the chassis, the handles will begin to close.
Push the handles in to fully close.
Step 4
Be sure that all cards are fully inserted in their respective chassis slots, and that the handles are in the
Note
locked position. This prevents accidental removal, provides proper grounding for the system, and helps
to seat the bus connectors in the backplane receptacles.

Connect Equipment to the Ports and Power On the System

Before performing the tasks in this section, take a few minutes to review
Note
below. It is important to understand the slot numbering for the leaf modules and spine modules (and the
corresponding spine RJ-45 ports). It is also important to understand the slot numbering for the fans and
power supplies (and the corresponding AC power inlets for the power supplies).
OL-8787-04
SFS 7012 Chassis — Spine Module Slot Numbering
Leaf Modules— Leaf modules should be populated beginning with slot 1, then slot 2, then slots 3
through 12 respectively. Refer to
Figure
2-10:
Leaf 11
Leaf 12
Leaf 10
Leaf 9
Leaf 7
Leaf 8
Leaf 5
Leaf 6
Leaf 4
Leaf 3
Leaf 1
Leaf 2
Cisco SFS 7012 InfiniBand Server Switch Hardware Users Guide
Figure 2-11
and
Figure 2-12
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sfs 7012

Table of Contents