11. While still at the microscope, press the wire down about 6mm [0.125"] from the
thermocouple bead using the tweezers or your finger. Place a piece of Kapton*
tape to hold the wire inside the groove (Figure 7-20). Refer to Figure 7-21 for
detailed bead placement.

Figure 7-20. Position Bead on the Groove Step

Kapton*

Figure 7-21. Detailed Thermocouple Bead Placement