C
C
H
A
P
T
H
A
P
T
G
G
E
T
T
I
N
E
T
T
I
N
Now that the site for your laboratory fume hood is
properly prepared, you are ready to unpack, inspect,
install, and certify your unit. Read this chapter to learn
how to:
• Unpack and move your Protector Radioisotope
Hood.
• Set up the fume hood with the supporting
structure and work surface.
• Connect to an exhaust system.
• Connect the optional filter packs to the exhaust
system (not sold through Labconco).
• Connect the electrical supply source.
• Connect the service lines.
• Seal the Protector Radioisotope Hood to the
hardboard support (included).
• Arrange certification of your Protector
Radioisotope Hood.
Depending upon which model you are installing, you
may need common plumbing and electrical installation
tools in addition to 5/16", 3/8", 7/16", and 1/2"
wrenches, ratchets, sockets, a nut driver set, a flat-blade
screwdriver, a Phillips screwdriver, and a carpenter
level to complete the instructions in the chapter.
The Protector Radioisotope Hood
models weigh between 500 to 700 lbs.
!
(227-318 kg). The shipping skid
allows for lifting with a mechanical lift
Product Service 1-800-522-7658
3
3
E
R
E
R
S
S
G
T
A
R
T
G
T
A
R
T
E
D
E
D
11
Need help?
Do you have a question about the Protector 4882200 and is the answer not in the manual?