Operation
Tying Down the Unit
When securing the unit for transportation, verify the
equipment being used to fasten the unit is in good
condition and has sufficient strength to hold the unit in
place during transport.
See
3-58. Use the tie-down points (C) as shown.
Figure
C
002538
Figure 3-58. Tie-Down Points
Owner's Manual for Mobile Light Tower
39
Need help?
Do you have a question about the MLTS and is the answer not in the manual?
Questions and answers