Download Print this page

GE Monitor UPC-900 Operating Instructions Manual page 33

Advertisement

4.2
Unpacking
Inspect the instrument
Unpack the instrument and check the items against the supplied packing list. Inspect
the items for obvious damage that may have occurred during transportation.
Note:
We recommend that all packing materials be retained if onward transport of the module
is expected.
Note:
4.3
Install the optical unit
Install the holder
Hook the holder (1) into the slot on the right hand side of the module. Secure it by pushing
the slide clamp up (2).
Monitor UPC-900 Operating Instructions 29-0567-16 AB
It is important that the filters, flow cells and lamps are not handled during
unpacking. For protection of these items, they should remain in their packing
materials until required for use.
pH measurement is optional in ÄKTA systems.
1
4 Installation
4.2 Unpacking
2
33

Advertisement

loading
Need help?

Need help?

Do you have a question about the Monitor UPC-900 and is the answer not in the manual?