NEC VERSA DOCKING STATION 4000 Manual page 27

Versa series
Hide thumbs Also See for VERSA DOCKING STATION 4000:
Table of Contents

Advertisement

3.
Verify that the power cord is plugged into the docking
station and that docking station power is turned on. (See
"Connecting the Power Cable" for details.)
The Docking LED should be a steady green, which indi-
cates that it is ready for docking.
On the back of the NEC Versa, open the expansion port
4.
cover and slide it underneath the expansion port.
Check that all other NEC Versa port covers are closed.
Opening the NEC Versa expansion port cover
Docking/Undocking the NEC Versa 2-5
Docking LED

Advertisement

Table of Contents
loading

Table of Contents