Download Print this page

Thor Broadcast H-1SDI-ATSC-IPLL User Manual page 8

1-4 sdi to qam modulators and iptv streaming encoders

Advertisement

Chapter 2 Installation Guide
2.1 Acquisition Check
When users open the package of the device, it is necessary to check items according to packing
list. Normally it should include the following items:
 Encoder Modulator
 Power Cord
 Ground lead
If any item is missing or mismatching with the list above, please contact local dealer.
2.2 Installation Preparation
When users install device, please follow the below steps. The details of installation will be
described at the rest part of this chapter. Users can also refer rear panel chart during the installation.
The main content of this chapter including:
 Checking the possible device missing or damage during the transportation
 Preparing relevant environment for installation
 Installing Encoder Modulator
 Connecting signal cables
 Connecting communication port (if it is necessary)
2.2.1 Device's Installation Flow Chart is Illustrated as following:
Acquisition
Fixing
Check
Device
Tel: (800) 521-8467
Connecting
Grouding
Connecting
Wire and
Signal Wire
Power
Cord
Email:
sales@thorfiber.com
H-1/2/4SDI-QAM-IPLL
Setting
Parameter
http://www.thorbroadcast.com
Running
Device
6

Advertisement

loading
Need help?

Need help?

Do you have a question about the H-1SDI-ATSC-IPLL and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

H-2sdi-atsc-ipllH-4sdi-atsc-ipll