Fit the lid (G) and secure it with the screw (F).
)
Undo the screws (P) to remove the lid (Q).
)
Use lever (R) to set the overload cutout to 1 A.
)
Fit the lid and secure it with the screws.
)
Replace the control panel (E) on completion
)
of the operation.
Remove the test voltage indicator sticker
)
from the dataplate and apply the new one to
identify the voltage being used.
Important
On completion of the operation make sure
that there are no malfunctions.
GB
Important
Before it is put into service, the system must
be tested to check the operating conditions
of every single component and identify any
malfunctions. In this stage, it is important to
check that all health and safety requirements
have been complied with in full.
To test the system, make the following checks:
Check that the mains voltage is the same as
)
that of the appliance.
_inst_GB
TESTING OF THE APPLIANCE
Operate the appliance's circuit-breaker to
)
check the electrical connection.
Check that the safety device is operating cor-
)
rectly.
After testing, if necessary instruct the user in all
the skills necessary for putting the appliance into
operation in conditions of safety, in accordance
with legal requirements.
-
-
Q
P
R
ITALIANO
Need help?
Do you have a question about the 1N1BR2EA and is the answer not in the manual?