2.5
Wiring and Connection
Prepare the electric actuator LE2FS series and Manifold controller.
Connect the Driver unit of Manifold controller and the electric actuator with the actuator cable.
For wiring details of the manifold controller, please refer to
"Manifold controller for electric actuator/JXD1-M*".
2.6
Test run
Perform a test run to ensure that the electric actuator is operating normally in the system.
For information on the operation method of the test run, refer to the following pages of the operation
manual "Manifold Controller for Electric Actuators / JXD1-M*".
12.1 Procedure for starting up the power supply.
12.2 Operation Procedure for Step Data No. Indicated Operation Function
3
Operation
For each operation procedure and timing chart, refer to the following pages of the operation manual
"Manifold Controller for Electric Actuators / JXD1-M*".
12.1 Procedure for starting up the power supply.
12.2 Operation Procedure for Step Data No. Indicated Operation Function
7. Wiring in the instruction manual
- 33 -
Need help?
Do you have a question about the LE2FS Series and is the answer not in the manual?