2
Installation and Initial Setting
2.1
Flow procedure from installation to initial setting
Be sure to check the procedure below before use.
① Checking the contents of the package
*:Please confirm that the actuator, accessories, and optional items are present.
② Preparation of necessary items
*:Prepare the electric wires, etc. required for installation of the electric actuator.
*:Refer to the operation manual
"Manifold Controller for Electric Actuators / JXD1-M*" for available wire specifications.
Procedure 1 Preparation
Procedure 2 Installation of electric actuators
Procedure 3 Wiring and Connection
Procedure 4 Test run
- 30 -
→Item 2.22.2
→Item 2.3
→Item 2.4
→Item 2.5
→Item 2.6
Need help?
Do you have a question about the LE2FS Series and is the answer not in the manual?