Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
1
2
3
4
5
6
7
8
9
inch)-60-inch machines only
-
Prepare the machine.
2
2
Install the ROPS pivot shoulder bolt.
2
2
4
4
2
Install the weights.
8
8
1
2
2
2
2
1
1
1
2
4
Install the bagger supports and brackets.
8
4
4
2
4
2
1
Install the bagger frame.
2
3
Install the bags.
1
Install the hitch cover.
Remove the existing belt cover, bracket,
-
and discharge chute.
1
1
3
1
Install the blower-pulley assembly.
1
2
2
7
Use