5. INSTALLATION
5.1.
RECEPTION OF GOODS
Each device is carefully checked before transportation. When receiving the goods, checking the devices for any damage made during transporta-
tion is recommended. If any damage to the unit is observed, immediately contact the representatives of a transport company. Please inform the
representative of the manufacturer, if any deviation of the device is noticed.
5.2.
TRANSPORTATION AND STORAGE
•
•
•
•
• The units must be transported to the storage place or installation site using forklifts.
• The recommended storage i period should not be longer than one year. In case of storing the units for a period longer than one year, checking
moisture has not accumulated must be performed before the installation of the unit.
RIRS EKO 3.0
400 VEL
400 VER
400 VWL
400 VWR
700 VEL
700 VER
700 VWL
700 VWR
To prevent damage to the casing, only a product placed on a pallet should be lifted.
5.3.
UNPACKING
Accessories may be packed together with the product. Prior to transporting the unit, the accessories should be unpacked
8
| EN
H
W
[mm]
[mm]
1200
670
1200
670
1200
670
1200
670
1205
795
1205
795
1205
795
1205
795
Figure 5.2.1 Lifting by forklift.
L
MAX. NUMBER OF
TRANSPORTED
PACKAGES
[mm]
[pcs.]
960
1
960
1
960
1
960
1
1240
1
1240
1
1240
1
1240
1
RIRS 400-700 V EKO 3.0 v2023.1