Installation Standard Work Checklist - Harman P42i-TC Installation Manual

Hide thumbs Also See for P42i-TC:
Table of Contents

Advertisement

Installation Standard Work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in
this installation manual.
Customer:
________________________________
Lot/Address: ________________________________
________________________________
Model: ________________________________
WARNING! Risk of Fire or Explosion! Failure to install appliance to these instructions can lead to a 昀椀 re
or explosion.
Appliance Install Section 3
Required non-combustible 昀氀 oor protection
Veri昀椀 ed clearances to combustible.
Unit is Leveled and secured.
Venting/Chimney Section 4
Venting Con昀椀 guration complies to vent diagrams.
Venting installed, sealed and secured in place with proper clearances.
Exterior wall/roof 昀氀 ashing installed and sealed
Terminations installed and sealed.
Electrical Section 1
120 VAC unswitched power provided to the appliance.
Check outlet with multi-meter for proper voltage. (115-120 VAC)
Record voltage reading: ___________
Appliance Setup Section 5
All packaging and protective materials are removed
Accessories installed properly
Manual bag and all it's contents are removed from inside the appliance
and given to party responsible for use and operation
Started appliance and veri昀椀 ed that all motors and blowers operate
as they should.
Checked draft using a Manometer. Record readings: __________
During operation, verify that the hopper lid switch (If applicable)
and pressure switch are working properly by brie昀氀 y opening the hopper
lid and main door and verifying that the feed motor is interrupted.
Hearth and Home Technologies recommends the following:
Photographing the installation and copying this checklist for your 昀椀 le.
This checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action
needed __________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments communicated to party responsible____________________ by ________________________ on __________
3
ATTENTION INSTALLER:
Follow this Standard Work Checklist
(Builder / Gen Contractor) (Installer)
Harman® • P42i Pellet Insert Installation Manual • 2023 -___ • 08/23
Date Installed:
Location of Stove:
Installer:
Dealer/Distributer Ph # __________________________
Serial Number:
YES
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
__________________________
__________________________
__________________________
__________________________
IF NO, WHY?
(Date)
8742-901D
04/23

Advertisement

Table of Contents
loading

Table of Contents