Commissioning The Inverter - Fronius Primo GEN24 4.0 Operating Instructions Manual

Hide thumbs Also See for Primo GEN24 4.0:
Table of Contents

Advertisement

16
17
Commissioning
1
the inverter
152
Place the cover on the connection
area. Tighten the five screws by rotat-
ing them 180° to the right in the indic-
ated order using a screwdriver (TX20).
Clip the housing cover onto the invert-
er from above.
Press on the lower part of the housing
cover and tighten the two screws by
rotating them 180° to the right using a
screwdriver (TX20).
Connect the solar module strings (+/-).
Switch on the battery connected to
the inverter.

Advertisement

Table of Contents
loading

Table of Contents