Commissioning
1
the inverter
2
Configuring PV
Firmware version 1.25.2 or higher is required to commission the PV Point Com-
Point Comfort
fort. Outdated firmware versions could lead to incompatibilities between the in-
verter and PV Point Comfort. In this case, the inverter firmware should be up-
dated in accordance with the instructions in
1
2
3
4
5
6
7
"PV Point"
Access the user interface of the inverter.
-
Open your web browser.
-
In the address bar of the browser, enter the IP address (IP address for
WLAN: 192.168.250.181, IP address for LAN: 169.254.0.180) or the host
and domain name of the inverter and confirm.
-
The user interface of the inverter is displayed.
Click the
"Device configuration"
Log in to the login area with the
word.
"Functions and I/Os"
Open the
Enable
"Backup power"
Select
"PV Point"
in the
Click the
"Save"
button to save the settings.
backup power mode has been configured.
Connect the solar module strings (+/-).
Switch on the battery connected to
the inverter.
Set the DC disconnector to the "On"
switch position. Switch on the auto-
matic circuit breaker.
Update
button.
"Technician"
user and the technician pass-
menu.
mode.
"Backup power mode"
on page 120.
drop-down list.