Settings on the user interface of the Fronius Primo GEN24 inverter:
1
2
Settings in the system monitoring of the Fronius SnapInverter:
1
2
I/O power man-
General
agement
In this menu item, settings relevant for a distribution network operator (DNO) are
made. An effective power limitation in % and/or a power factor limitation can be
set.
IMPORTANT!
Select the
word for the
be made by trained and qualified personnel.
"Input
1 click = white (contact open)
2 clicks = blue (contact closed)
3 clicks = grey (not used)
"Power factor (cos
"ind" = inductive
"cap" = capacitive
"DNO
When the rule is enabled, output
configured (e.g. for operating a signalling device).
For "Import" or "Export", the data format *.fpc is supported.
132
15 kW
0 0 1
6 kW
Configure the primary meter at the feed-in point in the
tion"
"Components"
Configure the secondary meter in the
ents"
menu.
Configure the primary meter at the feed-in point in the
menu.
Activate the limit for the entire system in the
power reduction"
menu. Enter the DC rated power of the entire PV system in
"Total DC system power"
the
60% or 70%) in the
"Max. grid feed-in power"
"Technician"
user for settings in this menu item, enter and the pass-
"Technician"
pattern" (assignment of individual I/Os)
φ)"
feedback"
6
7
2
menu.
"Device configuration"
input field. Enter the percentage value (50%,
user and confirm. Settings in this menu area must only
"DNO feedback"
6
6
0 0 1
0 0 1
7
7
1
1
"Device configura-
"Compon-
"Settings
"
→ "Meter"
"DNO Editor"
"Dynamic
input field.
(pin 1 recommended) must be