Panasonic EYADA Series Operating Instructions Manual page 104

Hide thumbs Also See for EYADA Series:
Table of Contents

Advertisement

HOW TO USE COMMUNICATION CABLE
Signal Timing
Example of actual
work
• Work completed with
two screws.
• Loosening is inserted
once in between.
Motor forward
signal
Motor reverse
signal
Fastening OK
signal
Fastening NG
(NOK) signal
Count-up signal
Drive permission
signal
• Only either one of "Fastening NG (NOK) signal" or "Count-up signal" can be used. Select
either one of them through "
46
EN
N = 1/2
Clutch activation
Fastening
(Forward)
ON
OFF
ON
OFF
ON
OFF
0.5 s
ON
OFF
0.5 s
ON
OFF
ON
OFF
The Electric Screwdriver starts and allows work only while
an ON signal is being input from an external device (PLC).
(Permission is given only to the tools to use. The tools that
should not be used are not given permission.)
b2
External-Output Signal Setting".
N = 1/2
Clutch activation
Fastening
(Forward)
Loosening
(Reverse)
" c7 Batch Complete Judgement
Waiting Time Setting"
(cont.)
P. 31
0.5 s
0.5 s
P. 41

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Eyada212xcEyada218xcEyada407xc

Table of Contents