Pre-Installation Procedure

1.
Follow Pressure Relief Procedure,
page 10.
2.
Close the shut-off valve (B), see F
page 9.
3.
Ground the hose and reel or console.
Leave at least two threads bare when
using PTFE tape. The bare threads
ensure that grounding is maintained.
NOTICE
If this is a new installation or if the fluid
lines are contaminated, flush the lines
before installing the metered dispense
valve. Contaminated lines could cause
the metered dispense valve to leak.
Never dispense compressed air with a
metered dispense valve. Dispensing
compressed air damages the metered
dispense valve.
4.
Flush equipment, see Flush
Equipment, page 11.
3A7397E

Flush Equipment

The equipment was tested with lightweight
oil, which is left in the fluid passages to
protect parts. To avoid contaminating the
fluid, flush the equipment with a compatible
solvent before use.
. 6,
IG
1.
Close the fluid shut-off valve (B) at each
dispense position, see F
2.
Verify that:
3.
Slowly open the main fluid outlet valve.
a.
b.
c.
4.
Slowly open the shut-off valve (B) at the
dispense position. Flush a sufficient
amount of oil to ensure that the entire
system is clean; then close the valve.
5.
Repeat Step 4 at all of the other
dispense positions.
Installation
the main fluid outlet valve at the
pump is closed.
the air pressure to the pump motor
is adjusted to minimize the system
flow rate, without the metered
dispense valve attached.
the air valve is open.
Place the hose end (with no
metered dispense valve
connected) into a container for
waste oil.
Secure the hose in the container so
that it will not become loose during
flushing.
For multiple dispense positions,
first flush the dispense position
farthest from the pump and work
toward the pump.
. 6, page 9.