Maintenance
6.4 If significant changes (e.g. > 2˚K) in the mixed water temperature are recorded in both
of these periods necessitating service work, then the next in service test should be
carried out at 18 to 21 weeks after commissioning.
7 The general principle to be observed after the first 2 or 3 in-service tests is that the intervals
for future tests should be set to those which previous tests have shown can be achieved with
no more than a small change in mixed water temperature.
8 In all areas periodic maintenance of the valve and associated fittings i.e. strainers, check
valves will ensure optimum performance levels are maintained.
Spares
A full range of spares are available for this product from Inta.
PLEASE NOTE: Only genuine spares should be used.
E
O.E
© Intatec Ltd 2013
Please leave this Manual for the User
To active your product warranty please visit
www.intatec.co.uk
and click on Product Registration
Intatec Ltd
Airfield Industrial Estate
Staffordshire
ST18 0PF
Tel: 01889 272 180
Fax: 01889 272 181
email: sales@intatec.co.uk
web: www.intatec.co.uk
30-08-13
Hixon
Need help?
Do you have a question about the Intatherm IT1005CP and is the answer not in the manual?