4. Mount the modules

The main mounting structure is composed of three modules
hanging on the carrier beam; one center module and two
identical side modules.
Mounting modules
1x
center module
(Box: B)
2x
side module
4x
sliding nut
(Box: C1, C2)
(Box: A)
6x
(M6x8, Hex 4 mm)
(Box: A)
8x
(M6x8, Hex 4 mm)
(Box: Center kit)
D15519.02 | 2024 JANUARY | Cisco Room Kit EQX Installation Guide
4.1. Slide nuts in the wall mount beam
Slide 4 nuts into the notch on the beam. Place the nuts below the keyholes, as shown in the illustration.