General Explanations; Preparation; Load Check; Boiler Location - Maktek OMEGA LCD Installation And Service Manual

Electric combi boiler
Hide thumbs Also See for OMEGA LCD:
Table of Contents

Advertisement

Pay attention to not damaging the electric cables and water pipes inside the
wall while making holes on wall for boiler mounting plate.
&
Electric shock as a result of the contact with electrical items.
Flood risk resuls from water pipe puncture.
Suitable profiled cables must be used in all electric connections.
Fire risk results from overheated law profiled cables.

1.3 GENERAL EXPLANATIONS

MAKTEK Electric Boiler provides the heating by central boiler heating system and
with radiators connected to the system and provides hot water by heat exchanger.
Installation and services must be in accordance with recent standarts and announced
directives. Our company is not responsible for damages caused from wrong
installation and usage.
Make sure the boiler is operated only to comply the intended use of the boiler. Any
usage which does not comply with the boiler's intended use may cause serious injury,
death or harms to the environment and goods.
Note: Maktek Omega LCD boiler is manufactured in 3 different specs for variety of
user demands such as; heating and domestic hot water (combi), only heating and
heating + external how water boiler model. Please discuss with our sales
representatives fro the best suitable model for your requirements.
ATTENTION ; Only Autorised Services and Manufacturer are responsible for the
boiler.Do not allow other people to interfere with the settings of the boiler.
1.4 C.O.S.H.H
Materials used in the manufacture of this appliance are non-hazardous and no special
precautions are required when fitting or servicing this appliance.

1.5 PREPARATION

1.5.1 Load Check

A load check should be taken into consideration when installing high output boilers.

1.5.2 Boiler Location

The boiler must be installed on a wall that will provide an adequate fixing, and should
be installed in a location that the boiler and pipe-work are not subject to frost and
damp conditions.

1.5.3 Central Heating Installation

Detailed recommendations are given in EN 12828.
Pipes forming part of the useful heating surface should be insulated to prevent any
potential heat loss or frost damage.
Drain valves should be fitted at the lowest point of the system pipe work in an
accessible position.
2

Advertisement

Table of Contents
loading

Table of Contents