Advertisement

Quick Links

rev.no:01
12.04.2019
BOILER
USER'S GUIDE
TS EN ISO 9001:2015
Please Keep
Please Read

Advertisement

Table of Contents
loading

Summary of Contents for Maktek Epsilon LCD

  • Page 1 BOILER USER'S GUIDE rev.no:01 Please Keep TS EN ISO 9001:2015 12.04.2019 Please Read...
  • Page 2: Table Of Contents

    CONTENT SAFETY WARNING................. page 1 GENERAL WARNING............... page 2 EXPLANATIONS................page 3 APPEARANCE AND EXTERNAL DIMENSIONS......page 4 INTERNAL STRUCTURE AND COMPONENT LİST......page 5 CONTROL PANEL................page 6-7 page 8 INSTALLATION DATA..............page 8 ELECTRICITY CONNECTION............page 9 POINTS TO CONSIDER AT INSTALLATION........page 9 MINIMUM SPACES CAN BE LEFT WHILE INSTALLATION....
  • Page 3: Safety Warning

    SAFETY WARNING Symbol Key This symbol expresses the risk of personal injury unless taking care of warnings. This symbol expresses the conditions can cause harms on environment, animals or goods unless taking care of warnings. Do not open the protective cover of the device. Electric shock as a result of the contact with electrical items.
  • Page 4: General Warning

    • First burning, maintenance and repairs can be done by only MAKTEK AUTHORISED SERVICES. Otherwise device will be out of gurantee and manufacturer is not responsible for breakdowns or damages.
  • Page 5: Explanations

    Boiler is under warranty in case of abiding the Warranty Conditions. It is recommended to making annual periodic maintenance in accordance with data on maintenance chapter. Only Maktek Autorised services can intervene the boiler.
  • Page 6: Appearance And External Dimensions

    APPERANCE AND EXTERNAL DIMENSIONS...
  • Page 7: Internal Structure And Component List

    INTERNAL STRUCTURE AND COMPONENT LIST 13. HOT WATER SYSTEM SENSOR 1. PROSESTAT 2. FAN 14. CHIMNEY OUT 3. SILICONE PRESSURE HOSES 15. FRESH AIR IN FLANGE 4. TOP SMOKE TANK 16. HERMETIC CABIN SIDE STEEL 5. HEATING SYSTEM EXCHANGER 17. BURNING ELECTRODE 6.
  • Page 8: Control Panel

    CONTROL PANEL All functions required to run the boiler, is done via two buttons on control panel. These functions can be followed on LCD sreen. All failure reportings can be seen on screen via specific codes. 1.P1 KEY DHW Adjustment: Temprature of the DHW is adjusted from here. Desired temprature blinkes on the screen.
  • Page 9 3. LCD SCREEN: Shows running and failure conditions with the warning codes on screen. These codes are: WARNING CODE SOLUTION EXPLANATION Low or high water pressure page 20) No Flame (page 20) Limit termostat (page 20) Chimney thermostat Call autorized service. Pump Failure Call autorized service.
  • Page 10: Installation Data

    INSTALLATION DATA ELECTRICITY CONNECTION • The boiler works with 230 v. 50 Hz. alternative current. • Please make sure that the fuse supplied along the boiler is installed maximum 10 cm . away from the boiler. • An electricity cable of 3x1,5 mm² must be laid out by an authorised electrician. •...
  • Page 11: Points To Consider At Installation

    INSTALLATION Wall mounted gas boilers work with natural gas, LPG and Propan; hence the installation of these items must be carried out by only authorised delaers. IMPORTANT ISSUES • Pipings must be cleaned before the installation of the unit. • The gas connection of the unit must be done properly and controlled for any leakages.
  • Page 12: Installation Connection

    GAS HEATING AND HOT WATER SYSTEM INSTALLATION CONNECTIONS • At DHW function, please make sure that the pressure of the city water network on cold water inlet side is not more than 6 Bars. If the network pressure is more than 6 Bars, a pressure regulator must be added.In order for the DHW system to run, the minimum pressure level of the network must be 0,8 Bar.
  • Page 13: Chimney Connection

    CHIMNEY CONNECTION 1. Elbow Set 2. Extra Pipe Joint 3. Clips 37 mm 4. Hermetic Chimney 5. Elastic Wall Badge CHIMNEY CONNECTION SIDELONG CHIMNEY CONNECTION BEHIND ATTENTION: Chimney must be installed downward- sloping way with %2 angle in order to prevent leaking condensing water into the boiler. Chimney shouldn't touch with flammable material, shouln't get throught flammable wall material.
  • Page 14: Water Flood To System

    WATERFLOOD TO THE SYSTEM AND FOLLOWING WATER PRESSURE Installation water pressure can be displayed digitally on LCD Screen. To display the pressure, place P1 Button as TEST, P2 Button as SUMMER on control panel (page 7). Water pressure will be displayed as bar. In first waterflooding air from radiators must be taken.
  • Page 15: First Operating

    B) FIRST OPERATING Maktek Autorized Services must do the first operating to validate the guarantee conditions. These steps must be applied: Be sure that fuse switch which makes energy connection of boiler, is open. If the boiler has waited for a long time after the installation in OFF mode without fist operating,Autorized service must check the circulation pump in case of squeezing.
  • Page 16: Usage Of The Boiler

    USAGE OF BOILER P1 KEY SETTING MODES P2 KEY SETTING MODES Central Central System DHW Open Winter System Temperature Temperature Setting Setting Off/Reset DHW Closed TEST Summer SUMMER MODE: When Summer mode is chosen boiler runs only to get DHW (30-60°C) set by P1 key when there is DHW demand.
  • Page 17 Attention!: If the boiler won't be used for a long time, noone will be in the house and there is a possibility of frost, discharge the water from heating circuit, close the gas valve of the boiler and disconnect the electricity connection. Freezing protection function will be unusable and damaged as a result of disconnecting gas and electric without discharging the water completely.
  • Page 18: Technical Specifications

    TECNICAL SPECIFICATION TABLE...
  • Page 19: Electricity Connection Schema

    ELECTRICITY CONNECTION SCHEMA...
  • Page 20: Hydrolic Schema

    HYDROLIC SCHEMA 1.Prosestat 8.Central heating circuit heat sensor 2.Fan 9.Hot water sensor 3.Heating circuit exchanger 10.Pressure gauge 4.Maximum heat sensor 11.Gas valve 5.Expansion tank 12.DHW exchanger 6.Burner 13.Filling valve 7.Three Way Valve Engine 14.Circulation pump...
  • Page 21: Safety Systems Of Boiler

    SAFETY SYSTEMS OF BOILER MAKTEK BOILER; is accompanied by all security measures neccessary for your valuable user's comfort . 1- NO BURNING, MISLEADING FLAME This problem occurs when there is no burning on the burner and E01 warning code appears on LCD screen.
  • Page 22: Gas Pressure Setting

    GAS PRESSURE SETTING MAKTEK BOILER GAS PRESSURE SETTINGS IMPORTANT NOTE: This modification This modification operation can only done by an authorised service. Diameter of the injectors must be suitable for fuel type used. Natural Gas injector diameter: 1.25mm LPG/Propan Injector diameter: 0,75mm Attention: Be sure about the resealing of the parts that were unsealed while gas modification operation.
  • Page 23: Maintenance

    It is recommended to make yearly maintenance to increase the lifespan, efficient usage, energy saving and protect quality at the beginning. Maintenance must be done by only MAKTEK Autorised Service. Intervention of private services except autorised services, is extremely dangerous and causes out of warranty coverage.
  • Page 24: Guarantee Conditions

    GUARANTEE CONDITIONS This guarantee is for 3 years , starting from the date the boiler is first put into service. In order for this guarantee to be valid, first operation and periodical maintainance must be performed by an authorised service in your area. Attention:The selection of the area where the boiler is installed, must be in conformity with all relevant directives and laws of the country.
  • Page 25: Important Safety Data

    ATTENTION ! IMPORTANT INFORMATIONS FOR YOUR SAFETY Please keep these warnings to prevent potential dangers! In Case of a Gas Leakage Do not put light fire and prevent formation of sparking Open the doors and windows Turn off the gas valve Call the authorised installation company Obey the security protocols of the gas distribution company Cut the electricity connection by a seperate fuse or switch...
  • Page 26: Efficient Usage Of Boiler In Terms Of Energy Consumtion

    •It is recommended to make maintenance and control of heating systems which includes burner settings based on flue gas mesaurement by Maktek autorised services before every heating season. •Heat isolation of pipes and tanks must be done if the boilers are in a place that no need of heating.
  • Page 27: Carrying And Transport

    USAGE WITH LPG Boiler can be use with LPG. Boilers that Natural gas / LPG Modification was done by MAKTEK Autorised Services or produced suitable for LPG burning , must be run with minimum 2 tubes by building suitable collector system.
  • Page 28 Seller: 10013 Street. No. 14 A.O.S.B. Çiğli - IZMIR / TURKEY Customer care: sales@maktek.com.tr Customer Hot Line: +902323280365 www.maktek.com.tr...

Table of Contents