Mounting And Installation; Unpacking; Delivery Content; Instructions For Mounting - Maktek OMEGA LCD Installation And Service Manual

Electric combi boiler
Hide thumbs Also See for OMEGA LCD:
Table of Contents

Advertisement

3.MOUNTING AND INSTALLATION

3.1 UNPACKING

Open the box as seen in the above sketch. Place the box on the ground, arrows on the
box pointing to the ground. Cut the cords or remove the staples, fold the lids of the box
on each side and turn the box upside down. Pull the box upwards and remove it.

3.1.1 Delivery Content

6-40 kW
QTY
DESCRIPTION
1
Electrical Combi Boiler
Wall Mounting Plate
1
Documents Pack
1
10x50 Wall Plug
4
M7x50 Screw
4
RCD Device
1
RCD Device Box
1
4x30 Wood Screw
2
6 mm Wall Plug
2

3.2 INSTRUCTIONS FOR MOUNTING

Boiler should not be installed in humid places such as bathrooms and areas that may
be affected by rain water.
The boiler should be installed on strong walls that can carry it and perpendicular to the
ground.
Spesific space must be left around the boiler for the authorized service to intervene in
the event of a technical breakdown or maintenance. You can find the minimum spaces
required for installation in the below diagram.
Only use the wall plugs, screws and wall mounting plate supplied with the device during
installation.The boiler must be installed vertically (upright position) and checked with a
spirit level so that it can work properly after installation. Failure to do so will invalidate
the warranty.

3.3 MINIMUM SPACES FOR INSTALLATION

At least the following space must be left in order to reach the internal parts of the
device easily when a failure occurs or when maintenance is carried out.
Suggested space is the minimum and it is favorable to leave more space depending on
the situation.
50-100 kW
QTY
DESCRIPTION
Electrical Combi Boiler
1
Wall Mounting Plate
1
Documents Pack
1
10x50 Wall Plug
4
M7x50 Screw
4
10

Advertisement

Table of Contents
loading

Table of Contents