Bowers & Wilkins 704 S2 Series Service – Technical Manual page 23

Hide thumbs Also See for 704 S2 Series:
Table of Contents

Advertisement

Correct position of the cables can be determined using the below image and bullet points:
Red (HF+) (1)
Black (HF-) (2)
Blue (LF-) (3)
Brown (LF+) (4)
Reassembling the Terminal Tray/ Port
Please work backwards through the Terminal Tray/ Port Removal process ensuring all the
below points.
Cables are fitted securely and correctly
All screws are tightened
The contents of this document and associated files contain confidential information that is propriety to B&W
Group Ltd., and are intended solely for the purpose of servicing the product. The information is intended for use
by service technicians familiar with electronic products. No part of the contents should be supplied or published
elsewhere.
Page 23
1
2
4
3
© B&W Group Ltd 2017

Advertisement

Table of Contents
loading

Table of Contents