Breaking In A New Machine; Machine Information - SANY SPR160C-8 Operation And Maintenance Manual

Pneumatic tire roller
Table of Contents

Advertisement

Introduction
Fig 1-2
1. Front

1.3.2 Breaking in a New Machine

Your machine has been well adjusted and tested before delivery. However, initial operation on the
machine in severe conditions will seriously affect the performance or reduce the service life of the
machine. Thus SANY recommends you to perform a 100-hour test run before putting the machine
into production use.
During the break-in period:
Let the machine warm up prior to any operation.
Avoid operating or running the equipment at a high speed in overload working conditions.
Avoid sudden starting, rapid movement or abrupt stop of the equipment.
Cool down the system of the equipment at the end of every working day.

1.3.3 Machine Information

The serial numbers and model numbers on the components are the only numbers that your SANY
distributor will need when ordering replacement parts or requiring assistance for your machine.
You can find the related information on the name plate. It is a good idea to record these information
in this manual for future use.
On the front right plate of frame locates the
name plate.
1-6
2. Right
Operation and Maintenance Manual-Oct. 2018
SPR160/200C-8 Pneumatic Tire Roller
3. Back
Fig 1-3
4. Left

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spr200c-8

Table of Contents