SSR200/220 Series Single Drum Roller
1.3.2 Breaking in a New Equipment
Your equipment has been well adjusted and
tested before delivery. However, initial opera-
tion on the equipment in severe conditions will
seriously affect the performance or reduce the
service life of the equipment. Thus SANY rec-
ommends you to perform 100- hour test run
before putting the equipment into production
use.
During the break-in period:
•
Let the equipment warm up prior to any
operation.
•
Avoid operating or running the equipment at
a
high
speed
conditions.
•
Avoid sudden starting, rapid movement or
abrupt stop of the equipment.
•
Cool down the equipment system at the
end of every working day.
in
overload
working
Safety, Operation and Maintenance Manual-Jan. 2019
Introduction
1-7